Project Started:July 31st 2015

Contracted by Morrison Construction to carry out all the bulk earthworks including removing 30000T peat off site and extracting 18000T rock to be reused on site using mobile crushers to produce suitable quarry materials. We are also constructing reinforced concrete walls to create an upper car park. Once the site is at the reduced levels for the Anderson High School and Halls of residence they will be handed over to P J Carey who are subcontracted to Morrisons to carry out the substructures.

Once theĀ roads and car park are reduced to formation levels we will commence installing the foul and surface water drainage as well as the external services and rising water mains. Later on in the project we will form the roads and carpark ready for paving and surfacing.

You can watch a bit of footage taken during excavating / buiding retaining wall at upper car park:

Related services: Earthworks & Groundworks, Drainage & Utilities, Road Construction & Surfacing